Ravine Restoration
DEP has issued a permit for Messiah College to renovate and restore the ravine behind Frey Hall. This ravine carries rainwater from the Kline/Jordan parking lot as well as the roofs from all the surrounding buildings. This work consists of running a pipe from an existing drainage pipe (located behind Frey Hall) to an existing pipe at Creekside Drive. This pipe runs under Creekside Drive to the Yellow Breeches.




June 15, 2017





June 26, 2017

June 29, 2017
The ravine drainage project is moving along. Catch basins have been set and most of the piping has been installed. The contractor is now backfilling.
The first two pictures are from the rear of Frey Hall looking down towards Creekside Dr.. The third is from Creekside Dr. looking up towards the rear of Frey Hall



July 13, 2017


July 21, 2017

September 21, 2017
Project Complete

10-6-17


