Work is complete
7-7-2023
6-23-2023
6-9-2023
5-26-23
5-19-2023 Framing the inside
4-17-23 Work begins at the rear of Engle Center
CHP Hot Water Connection to the Engle Health Center
10-26-22
10-25-22
10-24-22
Natural Gas Line Relocation
12-20-22
11-2-22
11-1-22
10-24-22