APPLY TO MESSIAH

Jordan Lab Hood Ventilation Project

September 2009 -

This project has been completed.  The new system is designed to prevent hood exhaust from reentering building.

July 2009 -

This project is being undertaken to allow better ventilation at the lab hoods.  Additional outside air (make up) will be introduced at each hood.  The exhaust from the hoods will be directed through new exhaust "chimneys" through the roof.